Alarm management is the discipline of designing, operating and maintaining a plant's alarm system so that every alarm is useful, clear and actionable. A well-managed system tells operators about real problems in time to act. A poorly managed one buries them in noise.
In oil, gas, chemical and power plants, operators watch hundreds or thousands of process variables from a control room. When too many alarms sound at once, an "alarm flood", important alarms get missed or ignored. Many serious process incidents involved operators who were overloaded by alarms that were not prioritised or not needed.
The UK HSE explains the issue clearly in its guidance on why alarm management is an issue. It is a human factors problem as much as a technical one.
A good alarm meets four tests:
An alarm that fails any of these tests is a candidate for removal, re-setting or redesign.
The international standard ANSI/ISA-18.2 describes alarm management as a lifecycle, not a one-time project. See ISA's overview of the updated ISA-18.2 alarm management standard.
|
Stage |
What happens |
|---|---|
|
Philosophy |
Define the rules for alarms, priorities, roles and performance targets |
|
Identification |
Find the conditions that need an alarm |
|
Rationalisation |
Justify each alarm, set its limit, priority and operator response |
|
Detailed design |
Design the alarm displays, sounds and logic |
|
Implementation |
Install, test and train operators |
|
Operation |
Run the system day to day |
|
Maintenance |
Keep alarms and instruments in working order |
|
Monitoring and assessment |
Measure performance and find bad actors |
|
Management of change |
Review every alarm change before it goes live |
|
Audit |
Check the whole system on a regular schedule |
Track these every month. A small number of bad actors usually causes most of the noise, so fixing them gives quick results.
Alarm systems often connect to safety instrumented functions, so also review functional safety and SIL management. Equipment condition matters as well. Our guide to asset integrity management shows how inspection and alarms work together.
What is an alarm flood? An alarm flood is a period when the number of alarms is higher than an operator can respond to. It usually happens during plant upsets.
What is the difference between alarm management and alarm rationalisation? Rationalisation is one stage of the lifecycle. It reviews each alarm and sets its limit, priority and response. Alarm management covers the whole lifecycle.
Which standard covers alarm management? ANSI/ISA-18.2 is the main standard. Many plants also use the EEMUA 191 guidance.
Who is responsible for alarm management? Operations, control and instrument engineers, and process safety teams share it. A named owner for the alarm system keeps it from drifting.
What skills does the team need? Alarm philosophy, rationalisation, performance analysis and management of change. Our alarm systems management programme for engineers and technicians covers these skills. To see where your team stands, use a competency assessment.
TRACEZ helps technical teams in India, the UAE and Oman build process safety, control and reliability competence. Explore our technical programmes, or talk to our team about training for your site.